2013-2015 – Metrostav, a.s. – Prunéřov Power Plant II – comprehensive renovation About This Project: Assembly of hoppers and wrappings of boilers C, D, E Assembly and sanitation of steel floor structures Previous and next references ← 2012 – SD – ÚU Ledvice – reconstruction of transport bridges F+G2014-2015 – Metrostav, a.s. – Selectrona Košťany – production hall → Back to the overview of references