by admin6837 | Oct 20, 2022
2016 – BASALT Měrunice – winter outage About This Project Replacement of the transport bridge support. Sorting room sheathing. Replacement of branching chute linings. Rebuild of aggregate dispenser. Rebuild of vibrating feeders. Previous and next references ←...
by admin6837 | Oct 20, 2022
2016 – AFSI – storage conveyor About This Project Design, production and assembly of storage conveyor. Previous and next references ← 2015-2016 – Nemak – steel floor structures of the Karusel line 2016 – BASALT Měrunice – winter outage → Back to the overview...
by admin6837 | Oct 19, 2022
2015-2016 – Nemak – steel floor structures of the Karusel line About This Project Design, supply and installation of steel floor structures line Karusel (80t). Previous and next references ← 2015 – Spolchemie, a.s. ÚnL –heated hot water pipes 2016 – AFSI –...
by admin6837 | Oct 19, 2022
2015 – Spolchemie, a.s. ÚnL –heated hot water pipes About This Project Production and assembly of supporting steel structures. Replacement of pipeline DN500 and DN300. Installation of pumps. Přadchozí a následující reference ← 2014-15 – Metrostav, a.s. –...
by admin6837 | Oct 19, 2022
2014-15 – Metrostav, a.s. – Selectrona Košťany – production hall About This Project Production and assembly of steel structures for exchanges. Sheathing assembly. Production and assembly of footbridges, stairs, ladders and other steel structures. Previous and next...